Close Menu
    Stay Up-to-date Via Email

    What's Hot

    Fallon Reveals Its 37-Story, 600-Room East Bank Hotel In Nashville.

    November 5, 2026

    397-Acre Countryside Estate Hits The Market For $29.5 Million In Spring Hill.

    November 4, 2026

    Axiom Builders Names Ryan Saunders Director Of Partnerships In Nashville.

    November 4, 2026
    CITY NOW NEXT
    • Subscribe
    • Home
    • Let’s Connect
    • Sponsors
      • MEDIA KIT
    CITY NOW NEXT
    Home»North Nashville»Construction Progress At Neuhoff Germantown Blocks 1 & 2 In Nashville.
    North Nashville

    Construction Progress At Neuhoff Germantown Blocks 1 & 2 In Nashville.

    Robert Looper IIIRobert Looper IIIMarch 28, 20223 Mins Read
    Facebook Twitter Pinterest LinkedIn Tumblr WhatsApp VKontakte Email
    Share
    Facebook Twitter LinkedIn Pinterest Email

    Neuhoff Germantown is a new mixed-use District along the Cumberland River Waterfront. Blocks 1 & 2 include a new mixed-use office building & the adaptive reuse of the former Neuhoff meat packaging plant.  The two parcels are situated along Adams Street between Taylor & Monroe Streets.

    Slide the image to See What’s Now & Next.
    Blocks 1 & 2 Along Adams Street.

    New City Properties acquired the 14-acre site in the Germantown neighborhood in 2019. They enlisted the design services of Smith Gee Studio for the adaptive reuse component, S9 Architects as the master planner, and HKS as the Designer of Record for the entire site. Here’s the quick rundown:


    Development Rundown

    Neuhoff Blocks 1 & 2

    • What’s now: Former Industrial Site
    • What’s Next: Mixed-use District
    • Developer: New City Properties
    • Location: 1320 Adams Street
    • Record Architect: HKS
    • Adaptive Reuse Architect: Smith Gee Studio
    • Master Planner: S9 Architecture
    • Civil: Kimley-Horn
    • Contractor: JE Dunn

    Block 1

    Block 1 Office Tower East

    Block 1 consists of the Mixed-use Office East building. The 14-story structure will feature a stepped design with views of the Cumberland River. It will also bridge over Adams Street and connect to the building in Block 3. The bridge connector is shown in the image below.

    Renderings via New City Properties.

    The entrance into the office Lobby is located in a new plaza between blocks 1 & 2.  There is also more than 7,500 SF of retail space with access to the plaza.  The office space on the floors above have amenity terraces that takes advantage of the building’s architecture. 

    Close-up view of the Amenity Terraces, rendering via Metro.

    Block 2

    Block 2 the adaptive reuse of the Curved Building.

    Block 2 includes the adaptive reuse of the existing curved building. The basement and first level of the curved building is divided into 3 zones. On the basement level, Zone A proposes an expansive food hall concept which opens up to Level 1. It includes shell space for food vendors, future bars and restaurants. Zone B proposes shell space for a future gym that also opens up to level 1. It also includes a retail shell which opens up to an outdoor plaza. Zone C primarily consists of the outdoor plaza on this level.

    Proposed Food Hall & Retail Shell Highlighted in yellow.
    Proposed Gym & Retail Shell Highlighted in yellow.

    On level 1, Zone A proposes a new breezeway with an entrance into the food hall. There is also a large retail shell space with access to an exterior catwalk which overlooks the river. Zone B also includes a new exterior breezeway which opens up to an exterior courtyard and even more retail space.

    Rendering of the Breezeway on Level 1
    Proposed interior Courtyard Highlighted in yellow.
    Rendering of the proposed interior courtyard from the diagram above.

    Levels 2 – 4 consist of the office suites. There is a roof terrace on level 3 which sits behind the exposed concrete and brick structure on Adams St. Level 5 has a covered exterior porch with outdoor food prep area. There is also a large meeting room and lounge area on level 5.

    Below are some additional construction progress photos.

    Construction Progress

    Be sure to subscribe for more on this and other Developments In & Around Nashville!

    Share this:

    • Share on Facebook (Opens in new window) Facebook
    • Share on X (Opens in new window) X

    Like this:

    Like Loading…
    Share. Facebook Twitter Pinterest LinkedIn Tumblr WhatsApp Email
    Robert Looper III
    • Website

    Owner & Founder Of Nashville Now Next & City Now Next

    Related Posts

    Fallon Reveals Its 37-Story, 600-Room East Bank Hotel In Nashville.

    November 5, 2026

    397-Acre Countryside Estate Hits The Market For $29.5 Million In Spring Hill.

    November 4, 2026

    Axiom Builders Names Ryan Saunders Director Of Partnerships In Nashville.

    November 4, 2026

    VOCE Hotel & Residences Reveals Signature Rooftop Restaurant In Midtown Nashville.

    November 2, 2026
    Subscribe via Email

    Stay Up-to-date Via Email

    © 2026 City Now Next Real Estate Media, LLC. All content is the exclusive property of CityNowNext and NashvilleNowNext and should not be scraped, reproduced, or manipulated using Generative AI or other means without permission. Robert Looper III.
    • Home

    Type above and press Enter to search. Press Esc to cancel.

    Loading Comments...
    %d