Close Menu
    Stay Up-to-date Via Email

    What's Hot

    Renderings Revealed For Phase 1 Of Napier Sudekum Redevelopment In Nashville.

    November 6, 2026

    Fallon Reveals Its 37-Story, 600-Room East Bank Hotel In Nashville.

    November 5, 2026

    397-Acre Countryside Estate Hits The Market For $29.5 Million In Spring Hill.

    November 4, 2026
    CITY NOW NEXT
    • Subscribe
    • Home
    • Let’s Connect
    • Sponsors
      • MEDIA KIT
    CITY NOW NEXT
    Home»West Nashville»Proposed Beaman Site Framework Could Produce Multiple 25 Story Towers.
    West Nashville

    Proposed Beaman Site Framework Could Produce Multiple 25 Story Towers.

    Robert Looper IIIRobert Looper IIIJuly 29, 20223 Mins Read
    Facebook Twitter Pinterest LinkedIn Tumblr WhatsApp VKontakte Email
    Share
    Facebook Twitter LinkedIn Pinterest Email

    Local developer GBT, along with Monarch Alternative Capital, has submitted a proposed Urban Design Overlay (UDO) for the Beaman site in Midtown Nashville. The proposed Overlay outlines the framework for bonus height, interiors streets, open space, and other building and site characteristics. NashvilleNowNext reached out to the developer for additional context and received the following,

    “GBT Realty and Monarch Alternative Capital have filed an Urban Design Overlay (UDO) that reflects the generational potential of the former Beaman site. In advancing this UDO, our team will work closely with Metro Planning, council members and area stakeholders to establish an overlay that will allow for a redevelopment that is enhancing to the city and greatly increases connectivity throughout Nashville.”

    The 8 acre site is located between McGavock Street & Broadway to the North & South and between 14th & 16th Avenues to the East & West. The site is currently zone MUI-A which which is intended for a high intensity mixture of residential, retail, and office uses. Here’s the quick rundown:


    Development Rundown

    Beaman Site Mixed-Use

    • What’s Now: Car Dealership
    • What’s Next: Mixed-Use Development
    • Developers: GBT / Monarch Alternative Capital
    • Zoning & Land Use Rep: Bradley

    Future Streets

    The area is intended to see significant growth over the next few years. This not only includes the Beaman site but also the planned 2.7 Million SF Reed District between Broadway & Church Street; as well as a planned development between McGavock & Demonbreun streets. The streets highlighted in blue show the conceptual layout which can be changed or realigned as the development progresses. The plan does graphically account for a potential crosswalk on Broadway, however, it wasn’t clear if it would be signalized or part of the plan. Slide the image below which shows context using the conceptual diagram from the plan.

    Slide the image to see What’s Now & Next.

    Open Space

    The design of the site accommodates a variety of open spaces and focal points. It also includes a comprehensive plan for sidewalks, landscaping, and tree canopy. The conceptual open space plan below depicts proposed open space. All of the open spaces will be linked by a network of sidewalks, multipurpose paths, walkable lanes and bikeways to allow for non-motorized movement. Like the street plan, the open space plan may be adjusted as the development progresses.

    Slide the image to see What’s Now & Next.

    Bonus Height

    The plan area serves as a gateway to the Gulch, Midtown, Music Row, & Downtown. It is intended to promote growth with high-rise development containing a mixture of uses in a vibrant cohesive campus like development. The development also intends to activate and engage the area with ground-floor retail and an overall layout that continues the high-energy environment of surrounding neighborhoods. The development is divided into two major subdistricts:

    • Subdistrict 1 proposes permitting buildings up to 20 Stories or 315 feet.
    • Subdistrict 2 proposes permitting buildings up to 25 stories or 400 feet.

    The illustrative plan below is included in the submitted UDO and is shown for context only. The plan is subject to change.

    The project is scheduled for the 9/8/2022 Metro Planning Agenda.

    Be sure to subscribe for more on this and other Developments In & Around Nashville!

    Share this:

    • Share on Facebook (Opens in new window) Facebook
    • Share on X (Opens in new window) X

    Like this:

    Like Loading…
    Share. Facebook Twitter Pinterest LinkedIn Tumblr WhatsApp Email
    Robert Looper III
    • Website

    Owner & Founder Of Nashville Now Next & City Now Next

    Related Posts

    Renderings Revealed For Phase 1 Of Napier Sudekum Redevelopment In Nashville.

    November 6, 2026

    Fallon Reveals Its 37-Story, 600-Room East Bank Hotel In Nashville.

    November 5, 2026

    397-Acre Countryside Estate Hits The Market For $29.5 Million In Spring Hill.

    November 4, 2026

    Axiom Builders Names Ryan Saunders Director Of Partnerships In Nashville.

    November 4, 2026
    Subscribe via Email

    Stay Up-to-date Via Email

    © 2026 City Now Next Real Estate Media, LLC. All content is the exclusive property of CityNowNext and NashvilleNowNext and should not be scraped, reproduced, or manipulated using Generative AI or other means without permission. Robert Looper III.
    • Home

    Type above and press Enter to search. Press Esc to cancel.

    Loading Comments...
    %d