Close Menu
    Stay Up-to-date Via Email

    What's Hot

    30-Story Pendry Nashville Surpasses 20 Floors At Paseo South Gulch.

    November 25, 2026

    Time Mission Gaming Venue Opens December 16th In Downtown Nashville.

    November 23, 2026

    Mira Music Row Launches Sales Starting At $1.2 Million in Nashville.

    November 18, 2026
    CITY NOW NEXT
    • Subscribe
    • Home
    • Let’s Connect
    • Sponsors
      • MEDIA KIT
    CITY NOW NEXT
    Home»NASHVILLE TN»Germantown Parking Lot To Become 9-Story Development In Nashville.
    NASHVILLE TN

    Germantown Parking Lot To Become 9-Story Development In Nashville.

    Robert Looper IIIRobert Looper IIIOctober 13, 20262 Mins Read
    Facebook Twitter Pinterest LinkedIn Tumblr WhatsApp VKontakte Email
    Share
    Facebook Twitter LinkedIn Pinterest Email

    Germantown real estate activity continues to push forward as Oracle has started heavy infrastructure work on its World HQ, including the upcoming pedestrian bridge from Germantown to the East Bank. Continuing that trend, MXB Partners is looking to rezone a 0.38 acre site into a 9-story mixed-use development, which will be an 8 minute walk to the upcoming pedestrian bridge.  

    The property is situated between Atlas Apartments Germantown and the Extra Space Storage and is bordered by active construction projects to the East and West.  The current address is shown as 1216-1220 3rd Avenue N.

    Slide the image to see What’s Now & Next.
    Shown for context only.

    A request has been submitted to rezone the property from IR to SP zoning.  Once approved, the request would advance the mixed-use development on the 0.38 acres site. The request was made by Dale & Associates on behalf of the Property Owners.  Here’s the quick rundown:

    1216 3rd Avenue N

    Mixed-Use

    What’s NowParking Lot
    What’s NextMixed-Use
    DeveloperMXB Properties
    Architectroot ARCH
    CivilDale & Associates
    Residences75 Units
    Retail10,000 SF
    Final figures TBD.
    Slide the image to see What’s Now & Next.
    Shown for context only.

    Overall, the project will include 3 levels of underground parking, a large ground floor retail space, and 8 levels of residential units and multiple rooftop terraces.  The south face of the building has several setbacks to allow it to maximize the light and outdoor space for the 75-unit building.  The number units per floor range from 15 on the 2nd floor to 5 on the last 3 floors.  Although not shown graphically, plans indicate that the front of the building will have brick pavers,  There is also a pedestrian passage on the south end of the building.

    Slide the image to see What’s Now & Next.
    Shown for context only.

    The project is scheduled for the 11/12/2026 Metro planning Agenda.

    Be sure to subscribe for more on this and other Developments In & Around Nashville!

    Share this:

    • Share on Facebook (Opens in new window) Facebook
    • Share on X (Opens in new window) X

    Like this:

    Like Loading…
    Share. Facebook Twitter Pinterest LinkedIn Tumblr WhatsApp Email
    Robert Looper III
    • Website

    Owner & Founder Of Nashville Now Next & City Now Next

    Related Posts

    30-Story Pendry Nashville Surpasses 20 Floors At Paseo South Gulch.

    November 25, 2026

    Time Mission Gaming Venue Opens December 16th In Downtown Nashville.

    November 23, 2026

    Mira Music Row Launches Sales Starting At $1.2 Million in Nashville.

    November 18, 2026

    Demure Cocktail Lounge Plans December 3rd Opening In Nashville’s Germantown.

    November 17, 2026
    Subscribe via Email

    Stay Up-to-date Via Email

    © 2026 City Now Next Real Estate Media, LLC. All content is the exclusive property of CityNowNext and NashvilleNowNext and should not be scraped, reproduced, or manipulated using Generative AI or other means without permission. Robert Looper III.
    • Home

    Type above and press Enter to search. Press Esc to cancel.

    Loading Comments...
    %d