Close Menu
    Stay Up-to-date Via Email

    What's Hot

    30-Story Pendry Nashville Surpasses 20 Floors At Paseo South Gulch.

    November 25, 2026

    Time Mission Gaming Venue Opens December 16th In Downtown Nashville.

    November 23, 2026

    Mira Music Row Launches Sales Starting At $1.2 Million in Nashville.

    November 18, 2026
    CITY NOW NEXT
    • Subscribe
    • Home
    • Let’s Connect
    • Sponsors
      • MEDIA KIT
    CITY NOW NEXT
    Home»NASHVILLE TN»30-Story Pendry Nashville Surpasses 20 Floors At Paseo South Gulch.
    NASHVILLE TN

    30-Story Pendry Nashville Surpasses 20 Floors At Paseo South Gulch.

    Robert Looper IIIRobert Looper IIINovember 25, 20262 Mins Read
    Facebook Twitter Pinterest LinkedIn Tumblr WhatsApp VKontakte Email
    Share
    Facebook Twitter LinkedIn Pinterest Email

    SomeraRoad continues to make progress on the upcoming Pendry Nashville Hotel & Residences (Pendry Nashville), since breaking ground and launching sales last summer. The 30-story tower is close to reaching its final height, moving closer to delivering its 146 residences and 180 hotel keys. The hotel tower is part of SomeraRoad’s Paseo South Gulch development in Downtown Nashville.

    Developed in partnership with Trestle Studio and designed by Nashville’s ESa, Pendry Nashville offered several updates for what’s to come.  Following its groundbreaking in July of 2025, the developers have revealed images of its signature residences and amenities.  Additionally, Los Angeles-based Ten Five Hospitality group will lead food and beverage concepting and operations at the forthcoming hotel and residences.  Located in the historic Voorhees Building next door, the developer announced that Equinox is on track to open this winter.

    Construction Update

    Slide the image to see What’s Now & Next
    Shown for context only.

    Since breaking ground in July, crews have been working around the clock.  By December 2025 Clark Construction had made significant progress on the building excavation.  As of November 2026, they have completed the 21st-floor slab and are now working on the 22nd.  Windows now wrap the building through the 13th floor, and brick is going up on the north and west sides as the tower’s final look is taking shape. 

    December 2025
    November 2026

    Building construction activity remains on track for completion by the end of 2027.

    Be sure to subscribe for more on this and other Developments In & Around Nashville!

    Share this:

    • Share on Facebook (Opens in new window) Facebook
    • Share on X (Opens in new window) X

    Like this:

    Like Loading…
    Share. Facebook Twitter Pinterest LinkedIn Tumblr WhatsApp Email
    Robert Looper III
    • Website

    Owner & Founder Of Nashville Now Next & City Now Next

    Related Posts

    Time Mission Gaming Venue Opens December 16th In Downtown Nashville.

    November 23, 2026

    Mira Music Row Launches Sales Starting At $1.2 Million in Nashville.

    November 18, 2026

    Demure Cocktail Lounge Plans December 3rd Opening In Nashville’s Germantown.

    November 17, 2026

    Riverstone Capital’ Announces Its First TN Development Near The Nashville Zoo.

    November 17, 2026
    Subscribe via Email

    Stay Up-to-date Via Email

    © 2026 City Now Next Real Estate Media, LLC. All content is the exclusive property of CityNowNext and NashvilleNowNext and should not be scraped, reproduced, or manipulated using Generative AI or other means without permission. Robert Looper III.
    • Home

    Type above and press Enter to search. Press Esc to cancel.

    Loading Comments...
    %d