Close Menu
    Stay Up-to-date Via Email

    What's Hot

    ECCHO Live To Host Free Workshop At Soundcheck At Rock Nashville On Nov. 10.

    November 2, 2026

    MDHA Finalizes Phase 1 Of The 2,000-Unit Napier Sudekum Redevelopment In Nashville.

    November 1, 2026

    Margin District Unveils $6.85 Million Custom Flagship Residence In Downtown Franklin. 

    October 31, 2026
    CITY NOW NEXT
    • Subscribe
    • Home
    • Let’s Connect
    • Sponsors
      • MEDIA KIT
    CITY NOW NEXT
    Home»NASHVILLE TN»Local Developer Break Ground On 184-Key Hotel On Rock Block In Nashville.
    NASHVILLE TN

    Local Developer Break Ground On 184-Key Hotel On Rock Block In Nashville.

    Robert Looper IIIRobert Looper IIIOctober 9, 20233 Mins Read
    Facebook Twitter Pinterest LinkedIn Tumblr WhatsApp VKontakte Email
    Share
    Facebook Twitter LinkedIn Pinterest Email

    Sila Developments and Triumph Hospitality celebrated the groundbreaking of the Holiday Inn Express & Suites Nashville West End – University Area (Holiday Inn Express).  Designed by architect SV Design, the 184-room hotel is located on Rock Block in West End at the corner of Elliston Place and Louise Avenue.  It is also one block away from Vanderbilt University and a short walk to Centennial Park.  The address is 2221 Elliston Place.

    “Elliston Place, fondly known as The Rock Block, has a rich history that stretches back over one hundred years. It was a bustling hub of commerce in the late 1800s, a place where people came together to enjoy live music, delectable cuisine, and the company of friends. As we break ground for this new Holiday Inn Express, we honor Elliston Places’ past while embracing the promise of its future.”

    Andy Bhakta, Principle, Sila Developments

    The property has changed hands 8 times peaking at different points since it became known as Rock Block in the 80’s. This era gave the birth to such venues such as the Exit/In and The Gold Rush, and The End to name a few. The property peaked at $925,000 in 1982, at $700,000 in 1991, and last sold for $6.4 Million in 2019 according to public filings. The developer also has plans to install a historic display wall documenting the history of Rock Block. Elliston Place has also become a development hotspot with significant updates to the Ascension Saint Thomas Hospital Campus, Vanderbilt University, as well as planned multifamily projects. Here’s the quick rundown:

    Holiday Inn Express & Suites Nashville

    2221 Elliston Place

    What’s Now:Cleared Site
    What’s Next:Hotel
    Developer:Sila Developments
    Operator:Triumph Hospitality
    Brand:IHG
    Architect:SV Design
    Rooms:184 Keys
    Contractor:D.F. Chase

     

    NOW NEXT SLIDER ™️
    Slide the image to see What’s Now & Next.
    Shown for context only.

    The 8-story hotel has 2 levels of underground parking and includes a fitness center and rooftop pool deck. Construction started in early September and doors to the upcoming 184 room hotel are expected to open in the spring of 2025.

    SILA Developments recently received Metro Planning approval for the Marriott branded Element Hotel in downtown Nashville, also design by SV Design. Antioch-based Triumph Hospitality started in 2012 and now manages 7 hotels in Middle Tennessee including the Motif on Music Row which opens later this fall. This will be the third Holiday Inn Express that Triumph Hospitality manages, and they are honored to grow the partnership with Intercontinental Hotel Group (IHG). IHG operates over 6,000 hotels globally and this hotel is one of the additional 2,000 in their development pipeline.

    Be sure to subscribe for more on this and other Developments In & Around Nashville!

    Share this:

    • Share on Facebook (Opens in new window) Facebook
    • Share on X (Opens in new window) X

    Like this:

    Like Loading…
    Share. Facebook Twitter Pinterest LinkedIn Tumblr WhatsApp Email
    Robert Looper III
    • Website

    Owner & Founder Of Nashville Now Next & City Now Next

    Related Posts

    ECCHO Live To Host Free Workshop At Soundcheck At Rock Nashville On Nov. 10.

    November 2, 2026

    MDHA Finalizes Phase 1 Of The 2,000-Unit Napier Sudekum Redevelopment In Nashville.

    November 1, 2026

    Margin District Unveils $6.85 Million Custom Flagship Residence In Downtown Franklin. 

    October 31, 2026

    W.E. O’Neil Construction Appoints Nicholas (Nick) Schubert As General Counsel.

    October 29, 2026
    Subscribe via Email

    Stay Up-to-date Via Email

    © 2026 City Now Next Real Estate Media, LLC. All content is the exclusive property of CityNowNext and NashvilleNowNext and should not be scraped, reproduced, or manipulated using Generative AI or other means without permission. Robert Looper III.
    • Home

    Type above and press Enter to search. Press Esc to cancel.

    Loading Comments...
    %d